TODAY and CURRENTDATE in Calligra Sheets: Dates and Deadlines
Use Calligra TODAY or CURRENTDATE for calendar dates and due-date checks. Follow fixed-date examples and understand system-clock and recalculation limits.
Verification status: Current and historical registrations, complete clock callback and numeric representation were source-checked. Calendar/time arithmetic is independently derived; no clock evaluation, GUI refresh, import or timezone experiment was run for this guide. How formula examples are checked
Quick answer: TODAY returns the current calendar date when evaluated. CURRENTDATE is an active alias with the same no-argument contract. Adding 7 gives a date seven calendar days later; neither formula creates a permanent record of when a row was entered.
Availability and version history
- Introduced: First release unknown; both TODAY and CURRENTDATE are documented by Calligra 2.4.0 source.
- Supported in: Calligra Sheets 26.08.2; no retirement is established for either name.
- Scope: Desktop Sheets with the Date/Time module. Formulas use English names and semicolon separators.
- Checked: October 14, 2026. Documentation, complete source callback and independent calendar/time arithmetic. No clock evaluation, GUI refresh, import or timezone experiment was run for this guide.
Syntax and the CURRENTDATE alias
=TODAY()
=CURRENTDATE()
Both names take no arguments. Their registrations call the same complete routine, which reads QDate::currentDate(). Qt 6.8 documents this call as the system clock’s current date. The inspected callback does not establish a separate spreadsheet-level timezone setting.
Both spellings are present in Calligra 2.4.0 source. Their first introductions are unknown, and no retirement is established. The alias has the same complete native argument contract; this does not establish that another spreadsheet accepts CURRENTDATE on import.
Current date and a seven-day due date
In A1 enter Today, and in A2 enter =TODAY(). Apply a Date format to A2. Its expected result is the current system calendar date when the expression is evaluated. A number format can instead show the date’s serial day count; that is a presentation difference.
In B1 enter Due date, and in B2 enter:
=TODAY()+7
The independently reasoned result is seven calendar days after the evaluated date. For a single shared date reading, use =A2+7 instead. The date value constructor stores an integer number of days relative to the calculation settings’ reference date. Adding seven advances seven calendar days, including weekends and holidays.
No fixed current-date output is claimed, and no new native clock call was made for this guide.
Check the calendar arithmetic with fixed dates
Use fixed inputs to test the intended deadline rule independently of the clock:
| Fixed starting date | Operation | Independent calendar result |
|---|---|---|
| January 15, 2025 | Add 7 days | January 22, 2025 |
| January 28, 2025 | Add 7 days | February 4, 2025 |
| February 25, 2024 | Add 7 days | March 3, 2024 |
| December 28, 2025 | Add 7 days | January 4, 2026 |
For example, =DATE(2025;1;15)+7 represents the first row. The leap-year row counts February 29. These are independent Gregorian calendar calculations, not additional observed application results.
Due-date status without changing the original date
Keep an actual due date as a fixed date value in C2. In D2 enter =C2-TODAY(). The mathematical sign tells you whether that date is later, equal to or earlier than the date read by TODAY. If the evaluated date is January 15, 2025 and C2 is January 22, the independent result is 7. If C2 is January 12, it is −3. Format D2 as a number, rather than as a date.
This is a calendar-day difference, not a working-day count or a measurement of hours remaining. A deadline at a particular time requires a separate date-time rule; TODAY deliberately omits the time of day.
Recalculation and permanent records
TODAY reads the system date when evaluated. This guide does not promise automatic refresh exactly at midnight; workbook scheduling and GUI refresh were not tested. Around midnight, the system clock’s calendar date matters. A copied workbook can be evaluated on a machine with different clock or timezone settings.
For a permanent created-on date, enter or otherwise record a fixed date value. A TODAY formula is not an audit log, because a later evaluation can produce a different date. Preserve the underlying original date when calculating a moving status or reminder.
Official evidence and related guides
- Current registrations
- Complete current callback
- Calligra 2.4.0 registrations
- Numeric representation or type predicate
The clock callback, registrations and numeric date representation were source-checked. The examples above use independently checked calendar arithmetic; no GUI display, import, midnight scheduling or newer-version execution is claimed.