Quick answer: =SYD(12000,2000,4,1) gives an expected 4000 of depreciation for period 1. The sum-of-years’ digits method assigns more expense to earlier periods, using a fixed depreciable base rather than a constant percentage of the remaining balance.

Availability and version history

  • Introduced: Documented by the PlanMaker 2010 manual; the first introduction release remains unknown.
  • Availability: Documented in the 2026/NX English reference; no final supported-version endpoint is established.
  • Scope: Versioned PlanMaker documentation. Separate desktop/mobile introduction dates and execution parity are not established here.
  • Checked: October 14, 2026, against the official SYD reference. Examples independently calculated; no native PlanMaker test.

Syntax and period weights

=SYD(Cost, Salvage, Life, Per)
Argument Meaning
Cost Initial purchase cost
Salvage Expected residual value at the end of useful life
Life Number of depreciation periods
Per Period to calculate, in the same unit as Life

All four arguments are required. Use 1 for the first period. For a four-period life, the weights are 4, 3, 2, 1, and their sum is 10. The independently calculated expense is:

(Cost-Salvage)*(Life-Per+1)/(Life*(Life+1)/2)

The worked models use positive integer life, periods from 1 through Life, and cost at least as large as salvage. The function reference does not enumerate all invalid-input or fractional-period behavior.

SoftMaker cautions that SYD is only partly applicable under some countries’ tax laws, including Germany. The following is a hypothetical allocation model, not a determination that a tax authority accepts the deduction.

Build a complete four-year schedule

Enter these numeric inputs in a blank worksheet:

Cell Entry Meaning
B2 12000 Equipment cost
B3 2000 Residual value
B4 4 Life in years

Enter years 1, 2, 3, 4 in A8:A11. In C8, enter =SYD($B$2,$B$3,$B$4,A8) and fill down to C11. In D8, enter =$B$2-SUM($C$8:C8) and fill down to D11.

Year in A Expected C: Expense Expected D: Year-end carrying amount
1 4000 8000
2 3000 5000
3 2000 3000
4 1000 2000

The base is 12000-2000=10000. Multiplying that by 4/10, 3/10, 2/10 and 1/10 gives the four expenses. In C12, =SUM(C8:C11) returns 10000, and D11 reaches the stated residual of 2000.

In the cumulative formula, $C$8 fixes the first expense cell while the second end of the range moves down. That gives C8:C9 in row 9, then C8:C10 in row 10. An accidentally fixed final endpoint would repeat the wrong accumulated expense.

Compare expense with remaining value

An expense is the amount allocated during a period. The carrying amount is the balance after that expense. In year 1 here, the expense is 4000 and the remaining balance is 8000. They are not interchangeable outputs.

A straight-line comparison using SLN gives 2500 every year, totaling the same 10000. SYD changes the timing to 4000, 3000, 2000, 1000. Choose the model according to the applicable policy rather than choosing whichever produces the largest early expense.

Advanced example: the vendor’s ten-year asset

Keep the original schedule intact. In F2, enter 200000; in F3, enter 10000; in F4, enter 10. Enter period numbers 1 through 10 in E8:E17. In F8, enter =SYD($F$2,$F$3,$F$4,E8) and fill to F17.

Period Expected expense, shown to two decimals
1 34545.45
2 31090.91
5 20727.27
10 3454.55

The first figure matches SoftMaker’s example. Its unrounded value is 190000*10/55, or 34545.4545…. The denominator is 10*11/2=55, and the numerator’s period weight decreases from ten to one.

Put =SUM(F8:F17) in F19; expect 190000 before any separate rounding of individual postings. In F20, =F2-F19 gives the 10000 residual. Format expenses for display without prematurely rounding the numbers used by the sum.

Monthly models use monthly weights

Life and Per must share a unit. A life of 48 months with Per=1 is a first-month model; it is not the same weighting schedule as a four-year life with each annual amount divided by twelve. For example, =SYD(12000,2000,48,1) has an expected first-month expense of approximately 408.1632653061, whereas 4000/12 is approximately 333.3333333333.

Changing the unit changes the number of declining weights. Establish the intended depreciation schedule before switching between annual and monthly models. SYD itself has no acquisition-date or partial-first-period argument.

Troubleshooting and portability

  • The wrong year is calculated: check Per and begin the sequence at 1.
  • Totals do not match cost minus salvage: include each period exactly once, preserve fixed input references and check whether values were rounded before summing.
  • The inputs contain zero or negative life or an out-of-range period: correct the model. Do not infer a particular error token from another spreadsheet’s implementation.
  • Commas are rejected: use the local formula editor’s separator while keeping Cost, Salvage, Life and Per in that order.
  • The result differs after import: compare both input units and formulas, not just displayed currency amounts.

The examples follow the English reference’s comma notation. The source describes the sum-of-years’ digits method but does not establish identical coercion, error codes or workbook conversion in every client.