Quick answer: EDATE(start_date,months) moves a date by a signed calendar-month offset. =EDATE(DATE(2025,12,20),2) displays 2026-02-20. Google documents truncation of decimal month offsets; calendar months are not interchangeable with fixed 30-day periods.
Availability and version history
- Introduced: Introduction version not established by the official history reviewed.
- Availability: Documented in the rolling Google Sheets service; examples use the web spreadsheet workflow.
- Checked: October 14, 2026; official EDATE reference. Documentation check, not a new native test; existing example-verification notes retain their scope.
Syntax and arguments
=EDATE(start_date, months)
Both arguments are required. Supply a date-valued cell, DATE expression or appropriate numeric serial for start_date. A positive offset moves forward and a negative offset moves backward. Google explicitly says decimal parts of months are discarded.
Examples use English names, comma separators and decimal points. Check the spreadsheet locale, and date-format the result. The displayed ISO dates below are calendar expectations, not text returned by EDATE.
Three original worked examples
=EDATE(DATE(2025,12,20),2)
Expected date: 2026-02-20. The year boundary is included in the month calculation, and the twentieth exists in the destination month.
=EDATE(DATE(2025,12,20),-3)
Expected date: 2025-09-20. A negative offset moves the same anchor backward rather than changing the sign of a date serial.
=EDATE(DATE(2025,12,20),0.9)
Expected date: 2025-12-20. Truncation makes the offset zero. If decimal entries indicate a data-entry mistake, validate them instead of relying on the function to reject them.
Advanced example: compare truncation with rounding
=EDATE(DATE(2026,10,15),2.9)
=EDATE(DATE(2026,10,15),-2.9)
=EDATE(DATE(2026,10,15),-0.9)
Expected dates are 2026-12-15, 2026-08-15 and 2026-10-15. The offsets become 2, −2 and 0. Negative truncation moves toward zero, unlike rounding downward to the next lower integer.
These controls are intentionally away from month-end ambiguity. They test Google’s explicit offset rule without asserting every missing-day outcome.
Advanced example: keep each row tied to one anchor
Put =DATE(2026,10,15) in A2 and offsets −3, −1, 0, 1, 3 and 12 in B2:B7. In C2 enter and fill down:
=EDATE($A$2,B2)
Expected dates are 2026-07-15, 2026-09-15, 2026-10-15, 2026-11-15, 2027-01-15 and 2027-10-15. The absolute reference preserves the original anchor while each row supplies its own offset.
Chaining a one-month result and then shifting that result three months reaches 2027-02-15, four months after the original. It does not implement the same three-month-from-anchor rule. Keep the schedule’s definition explicit before filling a formula down.
Advanced example: distinguish months, days and month ends
=EDATE(DATE(2026,10,15),1)
=DATE(2026,10,15)+30
=EOMONTH(DATE(2026,10,15),1)
Expected dates are 2026-11-15, 2026-11-14 and 2026-11-30. The first advances one calendar month, the second adds thirty days, and the third chooses the last day of the target month.
The interval from October 15 to November 15 is 31 days. A different anchor can cross a month with another length. Neither EDATE nor EOMONTH automatically defines a holiday-aware working-day schedule.
Advanced check: compare original and reversed ordinary offsets
For an October 15, 2026 anchor, a three-month shift reaches January 15, 2027; shifting that ordinary mid-month result back three months reaches October 15 again. This is a useful control for the selected dates.
It is not a proof that every end-of-month composition preserves the requested day. Google’s short reference does not establish all short-month, timestamp-fraction and historical-serial cases. The 29th, 30th and 31st remain native test cases before deploying a schedule that depends on them.
Parsing, source arithmetic and errors
A slash-separated expression inside a formula is arithmetic. 10/10/2000 evaluates to 0.0005, although Google’s EDATE warning prints 0.005. Use DATE(2000,10,10) rather than treating the divided number as an entered date.
The reference does not supply a complete invalid-date, blank, Boolean or native error-code table. No Excel-specific error rule is imported. Preserve source text during conversion and compare a known DATE-based control when an imported workbook gives an unexpected answer.
Related guides and verification
Compare Microsoft Excel EDATE. Related Sheets guides: DATE, EOMONTH, DAYS and WORKDAY.
A guide in another program is a separate documented reference, not a guarantee of identical parsing, historical serials or native error displays. Use the function comparison tool to inspect guide coverage.
The complete guide and original examples were reviewed on October 14, 2026 against direct Google documentation. Expected calendar and numeric outputs were independently calculated; no native Google Sheets execution, mobile-client certification or complete input-conversion test was performed.