WORKDAY Function in Google Sheets: Syntax, Examples & Compatibility

Date & Time Beginner Google Sheets

Learn how to find a due date a set number of working days after an initial date in Google Sheets. Includes syntax, two verified-by-reasoning results, troubleshooting and portability notes.

Verification status: See the evidence and test scope described in this guide. How formula examples are checked

Quick answer: WORKDAY(start_date,num_days,[holidays]) moves by working days and returns a date. With the ordinary Saturday/Sunday weekend, four working days after June 1, 2026 is June 5. Optional holidays exclude additional dates.

Availability and version history

  • Introduced: Introduction version not established by the official history reviewed.
  • Availability: Documented in the rolling Google Sheets service; examples use the web spreadsheet workflow.
  • Checked: October 14, 2026; official WORKDAY reference. Documentation check, not a new native test; existing example-verification notes retain their scope.

Syntax and reliable inputs

=WORKDAY(start_date, num_days, [holidays])

start_date is the date from which to move. Positive num_days moves forward; negative values move backward. Google documents truncation of its decimal part, rather than rounding to the nearest integer. The optional holiday range must contain actual date values or numeric serials.

Examples use English function names and comma separators. Enter dates with DATE, and format the returned value as a date. TEXT in the two original controls makes the displayed result unambiguous; omit TEXT if a later formula needs the numeric date.

Two original worked controls

=TEXT(WORKDAY(DATE(2026,6,1),4),"yyyy-mm-dd")
=TEXT(WORKDAY(DATE(2026,6,1),-1),"yyyy-mm-dd")

Expected outputs are 2026-06-05 and 2026-05-29. From Monday June 1, the four forward steps land on Tuesday, Wednesday, Thursday and Friday. One backward step reaches the previous Friday.

The starting date is an anchor in these nonzero-offset controls, not the first counted forward step. A zero offset on a nonworking start is a separate native edge case not established here.

Advanced example: provide a real holiday range

Put =DATE(2026,6,3) in H2 and =DATE(2026,6,5) in H3. These are example company closures, not an automatically supplied public-holiday calendar.

=WORKDAY(DATE(2026,6,1),4,$H$2:$H$3)

Expected date: 2026-06-09. The eligible steps are June 2, June 4, June 8 and June 9. Both closures and the June 6–7 weekend are skipped.

With only H2 as the holiday argument, the expected date is June 8. Removing a holiday from the range changes the policy, so keep the holiday list visible beside the schedule.

Advanced example: generate milestones from a fixed anchor

Keep the two holidays above. Put =DATE(2026,6,1) in A2 and the integers 1, 2, 3 and 4 in B2:B5. Enter C2 and fill down:

=WORKDAY($A$2,B2,$H$2:$H$3)

Expected dates are June 2, June 4, June 8 and June 9. Both the anchor and holiday range use absolute references; only the offset changes. This is a cumulative schedule from one start, not four successive tasks whose durations should be added together.

If each task begins after the previous one, build and verify that dependency separately. The function supplies a calendar date; it does not infer resource capacity or task overlap.

Advanced example: count backward for a preparation deadline

Using the same holiday range:

=WORKDAY(DATE(2026,6,8),-2,$H$2:$H$3)

Expected date: June 2. Counting backward from Monday June 8 skips the weekend and Friday’s closure; Thursday June 4 is step one and Tuesday June 2 is step two.

A simple subtraction of two calendar days would produce June 6, a Saturday. Check the intended working calendar before calling a date a deadline.

Decimal offsets and weekend starts

The documented truncation rule gives these independently modeled controls:

Formula Expected date
=WORKDAY(DATE(2026,6,1),4.9) 2026-06-05
=WORKDAY(DATE(2026,6,1),-1.9) 2026-05-29
=WORKDAY(DATE(2026,6,6),1) 2026-06-08
=WORKDAY(DATE(2026,6,6),-1) 2026-06-05

A fractional input is not a partial working day. If 4.9 represents hours, effort or a rounding policy, convert it deliberately before using WORKDAY.

Returning a date versus counting eligible dates

The June 1–5 interval contains five Monday-through-Friday dates. Moving four workdays from June 1 reaches June 5. NETWORKDAYS answers the first question; WORKDAY answers the second.

This distinction is why replacing one function with the other is not a syntax-only edit. Holiday handling and whether the start date counts must remain explicit in any schedule.

Parsing, custom weekends and held error behavior

The ordinary function excludes Saturday and Sunday. Google documents WORKDAY.INTL for other weekend rules. Holidays are caller-supplied; this guide does not infer a national calendar from the spreadsheet locale.

Google’s warning about 10/10/2000 correctly identifies arithmetic rather than a date, but the shown quotient has a decimal-place typo: the actual value is 0.0005. Use DATE(2000,10,10) for the intended date.

Malformed holiday text, duplicate holiday entries, timestamp fractions, zero offsets on closures and exact error codes remain unverified. An imported workbook deserves its own small calendar controls rather than an assumed desktop-version fix.

DATE in Google Sheets · DATE in Microsoft Excel · WEEKDAY in Google Sheets · WEEKDAY in Microsoft Excel · Compare WORKDAY in Microsoft Excel

A guide for another spreadsheet is a separate product reference. It does not establish identical date parsing, serial boundaries or error displays after a file import.

The complete guide and original examples were reviewed on October 14, 2026 against direct Google documentation. Calendar, interval and numeric expectations were independently calculated; no native Google Sheets execution, mobile-client certification or complete input-conversion test was performed.