Quick answer: WORKDAY returns a date a specified number of working days away from a start date, with an optional holiday list. The current Collabora help has an unresolved working-start inclusion statement, so weekday-start expectations below remain qualified. Weekend-start examples avoid that specific ambiguity.
Availability and version history
- Introduced: original Collabora release and launch date are not established by the sources reviewed.
- Availability: documented in Collabora Office 26.04 help, scoped to the desktop-help release.
- Platform scope: online and mobile deployments are not inferred from desktop documentation.
- Checked: October 14, 2026. Direct function section and independent calendar controls; no native Collabora test was performed.
Syntax and arguments
=WORKDAY(start_date; days; [holidays])
Start date and signed day count are required; holidays is an optional range of nonworking dates. Positive counts move forward and negative counts move backward. Format the output as a date, not as a count.
Source hold: the 26.04 help says a working start day is included. The older guide instead stated that the start day is excluded. Its official worked example begins on a Saturday, so that example cannot resolve the working-start distinction. No native Collabora test has settled it here, and another product’s behavior is not treated as proof.
Two original controls, now explicitly qualified
=WORKDAY(DATE(2026;6;1);4)
=WORKDAY(DATE(2026;6;1);-1)
The older guide’s independently modeled expectations were 5 June 2026 and 29 May 2026, using an excluded-start convention. These dates and formulas are retained for traceability, but are not newly certified Collabora outcomes under the conflicting source prose.
For the positive four-day case, counting the working Monday itself as day one would instead reach Thursday June 4. Do not deploy that weekday-start schedule based solely on the previous guide. Test and record the exact product build, formula and holiday inputs before relying on the boundary rule.
Example 3: reproduce the official weekend-start control
The vendor’s complete example starts on Saturday 1 December 2001 and moves forward 17 workdays. Put that DATE value in C3 and numeric 17 in D3. Enter these five DATE-generated exclusions individually in F3:J3:
- 24, 25, 26 and 31 December 2001
- 1 January 2002
=WORKDAY(C3;D3;F3:J3)
The documented result is 28 December 2001. An independent Monday-through-Friday enumeration reaches the same date: December 3–7 contributes five days, 10–14 another five, 17–21 another five, and 27–28 the final two after the listed exclusions.
The Saturday start is not one of those working days, so the inclusion wording does not change this particular count. The provided dates are fictional test exclusions for this example, not an official holiday calendar for any location.
Example 4: enumerate a modern weekend-start schedule
Start from Saturday 6 June 2026, with no holidays:
=WORKDAY(DATE(2026;6;6);1)
=WORKDAY(DATE(2026;6;6);4)
The documentation-based Monday-through-Friday expectations are 8 June and 11 June 2026. The four counted dates are Monday June 8 through Thursday June 11. This control deliberately starts outside the working week to avoid the unresolved working-start rule.
If a task genuinely begins on a weekday, do not shift its input to Saturday merely to force a desired answer. The example design is for verification, not a scheduling workaround that silently changes the task.
Advanced example: apply a specific exclusion
Put =DATE(2026;6;10) in A2 and use:
=WORKDAY(DATE(2026;6;6);4;A2)
The independent weekend-start expectation is 12 June 2026. The counted dates are June 8, 9, 11 and 12; the Wednesday exclusion is skipped. Extending the holiday range requires actual date values for each intended exclusion.
The product page says text and empty cells in a data range are ignored. A date-looking text string that is skipped is not the same as a correctly stored holiday date. Use DATE-generated controls and inspect stored types if a listed exclusion appears ineffective.
Advanced check: compare a date offset with a workday count
For the four counted days June 8, 9, 11 and 12, an inclusive NETWORKDAYS interval from June 8 through June 12 with the same June 10 exclusion has expected count 4:
=NETWORKDAYS(DATE(2026;6;8);DATE(2026;6;12);A2)
NETWORKDAYS returns the count; WORKDAY returns a date. Its inclusive endpoint rule is explicitly documented and should not be used to guess the unresolved WORKDAY working-start rule.
Deployment and error boundaries
Holiday dates are supplied by the workbook, not automatically retrieved for the user’s location. Weekend customization and similarly named variants need their own documented syntax. Do not transfer NETWORKDAYS’ fourth workweek-vector argument into WORKDAY’s three-argument form.
Fractional offsets, zero offsets, reversed-direction weekend starts and exact native error codes remain unverified in this review. The usable documented example and explicit source hold are retained without making a broader product claim.
Related guides
References and verification
The complete older guide and original formulas were reviewed. Calendar calculations are independent expectations under the explicit conditions above; volatile functions were not executed, and retained source conflicts are not certified native behavior.