Contact

SoftMaker PlanMaker Starter Files and Practice Downloads

Choose a small identifier exercise, a longer inventory table or a budget input sheet. These plain CSV downloads are not finished PlanMaker templates: formulas, saved scenarios, styling and workbook sheets are not included. Use the originals as reference data and create separate working files.

The additional range-name inputs support a separate FreeOffice 2024 lesson; the CSV does not contain names or formulas.

Choose a starter

Download Bytes Layout including header Purpose
Product codes 74 4 rows × 3 columns Preserve five-character text codes while calculating stock
Inventory table 1,055 37 rows × 4 columns Practise navigating a longer table and checking quantities
Budget inputs 100 6 rows × 2 columns Add two simple formulas to supplied inputs
Range-name inputs 43 5 rows × 2 columns Check two expense columns before creating and applying names

All four are UTF-8, comma-separated files. The letters in these particular files are ASCII-compatible. Start at A1 and include the first line as ordinary column headings, not as a single unsplit header cell. The 2024 manual’s Number of header lines setting has a special meaning: use 0 to split these heading fields normally.

Product codes: preserve spelling, then total stock

The columns are Code, Description, Stock. The three records are 00123 / Widget A / 4, 00007 / Widget B / 3 and 01200 / Widget C / 2. Set Code to Text before accepting the import; Stock must remain numeric. Expected occupied range is A1:C4.

Compare all three codes with the source. Each is five characters, but length alone is insufficient. =SUM(C2:C4) should return 9; =COUNT(C2:C4) should return 3. If stock is text or an ID has lost zeros, re-import the untouched CSV rather than using number formatting to conceal the conversion.

The existing leading-zero import tutorial separates a FreeOffice 2024 desktop documentation route for Windows, macOS and Linux from the paid PlanMaker 2026 documentation reference. Neither route is native-tested; the paid reference does not establish identical FreeOffice controls.

Inventory: a longer navigation exercise

Columns are Item and Location as text, then Quantity and Reorder level as numbers. There are 36 records: 12 groups of Notebook, Pen and Folder entries. Each group’s quantities are 12, 30 and 8; its reorder levels are 5, 10 and 4. The first group uses the plain item names and later groups append batch numbers 2 through 12.

Expect A1:D37. Independently calculated checks are 36 numeric quantities, Quantity total 600, and Reorder level total 228. In unused cells, =COUNT(C2:C37), =SUM(C2:C37) and =SUM(D2:D37) should produce those values. All provided quantities exceed their row’s reorder level. This is a navigation fixture, not an automated reorder system or a real inventory.

Use the existing freeze-panes navigation guide for its documented workflow and version limits. The CSV itself has no frozen panes or saved print settings.

Budget: blank result cells are intentional

The two headings are Budget item and Amount. B2:B4 contain 5000 revenue, 1800 variable expenses and 1200 fixed expenses. B5 and B6 are blank beside Total expenses and Surplus. They are not missing download content.

In a working copy enter =SUM(B3:B4) in B5 and =B2-B5 in B6. Expect 3000 expenses and 2000 surplus. Change B3 to 1900 to test recalculation: expected results become 3100 and 1900. Restore 1800 afterwards. These are synthetic arithmetic inputs, not a financial plan.

The related budget scenario tutorial documents PlanMaker 2026, with FreeOffice unverified. Its Scenario manager is not required for this two-formula exercise. Likewise, the PMVX template procedure is scoped to paid PlanMaker 2026, explicitly excluding FreeOffice 2024; do not purchase or trial that edition to use these CSVs.

Range-name inputs: check the values before adding names

Start this exercise in a separate disposable workbook, not below the budget. The headings are Travel and Supplies; the four numeric pairs are 18/7, 24/11, 15/9 and 33/13. Expect A1:B5, with the headings in row 1. The CSV contains only these inputs, not a summary, named ranges or saved formula conversions.

Outside the input block, =COUNT(A2:A5) and =COUNT(B2:B5) should each return 4. =SUM(A2:A5) should return 90 and =SUM(B2:B5) should return 40. The combined expense total is 130. These checks establish the intended input values, not successful creation of any name.

Follow create and apply range names in FreeOffice to define Travel and Supplies and inspect the formula conversions. Its scope is FreeOffice PlanMaker 2024 for Windows, English ribbon, documentation-qualified. It is not evidence for paid PlanMaker 2026, another platform or native application execution. Check that the documented controls exist in your free installation; stop that dependent step if they do not, rather than upgrading or substituting a paid-edition procedure.

The lesson keeps an address-based control formula outside the selected conversion range. Unchanged totals alone cannot prove that the intended formulas, and only those formulas, were changed. Do not add the repeated summary checks together as though they were separate expenses.

For a reversible numeric control, change A3 from 24 to 29: Travel becomes 95, Supplies remains 40, and the combined total becomes 135. Restore 24, then change B5 from 13 to 8: Travel remains 90, Supplies becomes 35, and the combined total becomes 125. Restore 13. Save and reopen a separate spreadsheet working copy and check its names and formulas yourself; the CSV cannot retain those additions. No native import, naming, recalculation or reopen test was run for this catalogue addition.

Free-edition and verification boundary

The FreeOffice PlanMaker 2024 feature page documents a text-file import/export assistant and XLS/XLSX saving for Windows, macOS and Linux. The PlanMaker 2024 text-format manual describes delimiters, preview column types and the header-lines behavior. The general manual alone does not establish every paid/free control is identical. Both full pages were checked October 21, 2026.

For free-only use, check that your installed edition provides the required preview controls before importing text identifiers. If it does not, cancel that dependent exercise rather than accepting converted codes or upgrading. Save a separate XLSX working copy for the calculations and keep the CSVs unchanged. No PlanMaker edition was executed for this catalogue; results were calculated independently, and no new screenshot or save/reopen evidence is claimed. Consult versions and availability for the edition boundary.

Original-file integrity

The first three original UTF-8 downloads below were inspected on October 21, 2026. No replacement files were created. SHA-256 identifies the file, not successful application import:

  • product-codes.csv: 2e13e9e2710d0e65e5de946e226db51c4caee2216e5ddef7547ce75d5211b1f7
  • inventory.csv: 6cfcad4ac420ce7c8729ad906440fc157b91baccef86ddccd25fc07eec8d0785
  • budget-inputs.csv: f186bbf801c26a141f176cdd66ff4cb2aabf5d47dcc256cba66a55a33010df2c

The existing range-name input file was inspected separately on October 24, 2026. Its 43 bytes contain a header and four numeric rows, with no formula-leading cells. It was not replaced or newly created:

  • input-values.csv: 2483757fe8187e54b161b53ca4f5121a92547c3b190a2d5eb64995b5ac26587e

Continue the FreeOffice practice route

For this route, use only Budget: blank result cells are intentional above as preparation. You need to enter two formulas in a separate working copy and distinguish numeric inputs from blank result cells. Check B5=3000 and B6=2000, then the 3100/1900 changed-input results; restore B3 to 1800 before putting that copy aside. Keep the original CSV unchanged. This catalogue supplies existing practice inputs, not a finished template or an additional tutorial.

Next, center report headings without merging in FreeOffice. Start its new one-sheet heading workbook, not the budget copy: its A1:D1 title band, report and F1 note are a different fixture. You will practise presentation without changing cell addresses, then check totals of 32 and 36 and the untouched note.

The next lesson is documentation-qualified for FreeOffice PlanMaker 2024 for Windows, English ribbon. Check the documented controls in your existing free installation; stop if they are unavailable rather than purchasing or trialling another edition. The catalogue’s paid PlanMaker 2026 Scenario manager and PMVX links are separate references, not route prerequisites. Native import, execution and save/reopen remain unverified here.

Return to the PlanMaker practice route.