WORKDAY Function in WPS Spreadsheet: Syntax, Examples and Compatibility
Use WORKDAY in WPS Spreadsheet to find a due date a set number of working days after an initial date. Two original examples, expected results, cautions and official software documentation.
Verification status: See the evidence and test scope described in this guide. How formula examples are checked
Quick answer: WORKDAY shifts a starting date by a number of working days, excluding the standard weekend and supplied holiday dates. Positive counts move forward and negative counts move backward; the result is a date, not a workday count.
Availability and version history
- Introduced: documented by 2019-05-22 in the WPS lesson; original introduction is not established.
- Availability: historical Windows Personal lesson and current Windows FAQ; no minimum numeric build is specified.
- Scope: Windows documentation does not establish equivalent behavior in every other WPS client.
- Checked: October 14, 2026. Complete function-specific references and independent calendar models; no native WPS test was performed.
Syntax and arguments
=WORKDAY(start_date, days, [holidays])
The current WPS Windows FAQ explicitly labels holidays optional. The historical lesson describes the standard Saturday/Sunday weekend, a holiday date range or serial array, and truncation of noninteger days. Examples below state their excluded-start counting model explicitly.
Use English function names and comma separators as shown, adapting separators for the workbook locale. Display date/date-time outputs with an appropriate format and counts or durations as numbers. Expected outputs are independent models; live-clock and endpoint assumptions are explicit.
Example 1: original control
=WORKDAY(DATE(2026,6,1),4)
Stated counting-model output: 2026-06-05 (format the resulting date as YYYY-MM-DD).
Four working days after Monday are Tuesday, Wednesday, Thursday and Friday; the stated model excludes the start date.
Example 2: original comparison
=WORKDAY(DATE(2026,6,1),-1)
Stated counting-model output: 2026-05-29 (format the resulting date as YYYY-MM-DD).
Under that excluded-start model, moving back one working day from Monday reaches the preceding Friday.
Scope of the original counting controls
The two original outputs above use an excluded-start model: move away from the start and count eligible working dates reached. The WPS definition describes dates before or after the start, but its captured text does not provide a separate explicit start-day inclusion sentence or a zero-offset rule.
The stated model is therefore visible in these worked controls rather than presented as a new native boundary test. Zero offsets, weekend/holiday starts and precise fractional start-date handling remain separately unverified. The primary forward and backward examples begin on ordinary working dates.
Example 3: show every step in a forward count
Start on Friday 5 Jun 2026 and move three working days forward, with no supplied holidays:
=WORKDAY(DATE(2026,6,5),3)
Under the stated excluded-start model, the expected date is 10 Jun 2026. Saturday and Sunday are skipped; Monday 8 June is count 1, Tuesday 9 June is count 2 and Wednesday 10 June is count 3.
This trace is more useful than a result alone when checking a new client. It exposes the weekend and endpoint assumptions that an apparently plausible date can conceal.
Advanced example: add and lock a holiday list
Put =DATE(2026,6,3) in H2 and =DATE(2026,6,4) in H3. For a start of Monday 1 June:
=WORKDAY(DATE(2026,6,1),4,$H$2:$H$3)
Excluded-start model expectation: 9 Jun 2026. The counted dates are 2, 5, 8 and 9 June; the two supplied holiday dates are skipped in addition to the weekend.
The holiday list represents a fictional organization’s chosen exclusions. WPS is not being asked to discover public holidays automatically. Verify the intended calendar before using such a formula for a real schedule.
For starts in A2:A4 and counts in B2:B4, a fill-down pattern is =WORKDAY(A2,B2,$H$2:$H$3). The absolute holiday reference should stay fixed while each row’s start and count change.
Advanced example: document truncation of the day count
The historical source says a noninteger days argument is truncated. For the original Monday start, compare:
=WORKDAY(DATE(2026,6,1),4.9)
=WORKDAY(DATE(2026,6,1),-1.9)
Under the same excluded-start model, the expected dates are 5 Jun 2026 and 29 May 2026, matching offsets 4 and −1. This is removal of the fractional part toward zero, not rounding to the nearest integer.
If the business policy requires whole working days, reject or explicitly normalize fractional counts before calling the function. Do not assume a result date validates the original input policy.
Counting days is a separate question
NETWORKDAYS returns a workday count over an interval. WORKDAY returns a shifted date. The two do not become interchangeable merely because they share weekend and holiday concepts.
For the original Monday-to-Friday model, four forward moves reach Friday while an inclusive Monday-through-Friday calendar contains five working dates. Keep the endpoint convention visible when reconciling the two calculations.
Errors and unresolved boundaries
The historical source names #VALUE! for invalid date inputs and #NUM! for a start/count combination producing an invalid result date. Its exact text, Boolean, blank and duplicate-holiday coercion matrix is not established here. The current FAQ confirms checking date validity, the offset sign and fixed references; formatting alone does not prove a text value was parsed.
Custom weekend patterns require separately documented functionality. This guide does not import a WORKDAY.INTL mask table or another spreadsheet’s zero-offset behavior. Absolute serial origins and imported date-system differences also remain outside the tested scope.
Related guides and verification
- DATE in WPS Spreadsheet
- WEEKDAY in WPS Spreadsheet
- Compare WORKDAY in Microsoft Excel
- Compare WORKDAY in Google Sheets
Corresponding functions in another product require separate evidence for clock, endpoint, date-system and error behavior.
- WPS Academy: WORKDAY, 2019-05-22 (Chinese; Windows Personal).
- WPS Academy: DATE.
- WPS Windows WORKDAY FAQ.
- Editorial testing standards.
Evidence level: Full article and complete product-specific sources reviewed. Original title, publication date and two worked formulas are preserved. Additional calendar and time calculations are independently modeled; no native clock, application or import test is claimed.